Construction Bids/SOQs

Please click here to view the MSCAA Master Plan.

SOQs

Bid Name Date Issued Bid Opening Download
SOQ: Jet Bridge & Aircraft Parking Utilization Study
SOQ NO: 14-1374-00
04/14/2014 05/15/2014
2:00 PM
Local Time
See below
INFORMATION PACKAGE:
Please click here to download the Bid Package.
Please click here to download the Standard Form 330 – Architect/Engineer Qualifications.
LEGAL NOTICE:
Please click here to download the Legal Notice.

Construction




SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S
SMALL BUSINESS PROGRAM



Future Projects

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in planning. Estimate Date of Design: T.B.D. Estimated Date of Construction: T.B.D. . Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.

Plough Cargo Ramp
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Charles Baker Airport – Common Hangar Renovations
Project includes replacement of metal siding, metal roofing, trim, doors, and incidentals for four hangars. Project is currently in design. Estimated Date of Construction: 2014. Click here for sketch.

Charles Baker Airport – Terminal Building Replacement
Project includes demolition and replacement of the existing terminal facility as well as overlay and expansion of the existing parking lot. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

General DeWitt Spain Airport – Airfield Improvements
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Terminal Building Seismic Retrofit
Project includes retrofit to improve the airport’s seismic resilience. Project is currently in planning. Estimated Date of Design: 2014. Estimated Date of Construction: T.B.D..

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.