Please click here to view the MSCAA Master Plan.
SOQs
Construction
| Bid Name |
Date Issued |
Bid Opening |
Download |
Bid: Demolition of former City of Memphis Humane Shelter
Project # 13-1361-00
|
05/08/2013 |
05/28/2013 2:00 pm
Local Time |
See below |
Mandatory Meeting: A Mandatory Pre-Bid Meeting was held on Friday, May 17, 2013, at 9:00 AM at the Project Center, 4225 Airways Boulevard, Memphis, Tennessee 38116. The project site was available for inspection immediately following the meeting.
Sign-In Sheets:
Please click here to download the Sign-In Sheets.
Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda distributed at the Mandatory Pre-Bid Meeting. |
Proposal Package: Please click here to download Proposal Package.
Specifications:
Please click here to download the Specifications.
Drawings:
Please click here to download the drawing. |
Legal Notice: Please click here to download the legal notice. |
| Bid Name |
Date Issued |
Bid Opening |
Download |
BID: Demolition of Regency Inn & Suites
Project # 12-1348-00
|
05/08/2013 |
05/29/2013
2:00 pm
Local Time |
See below |
Addendum 1: Please click here to download Addendum 1.
Exhibit C: Please click here to download Exhibit C as referenced in Addendum 1.
|
Mandatory Meeting: A Mandatory Pre-Bid Meeting was held on Wednesday, May 15, 2013, at 9:00 AM at the Project Center, 4225 Airways Boulevard, Memphis, Tennessee 38116. The project site was available for inspection immediately following the meeting.
Sign-In Sheets:
Please click here to download the Sign-In Sheets.
Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda distributed at the Mandatory Pre-Bid Meeting.
|
Proposal Package: Please click here to download Proposal Package.
Specifications:
Please click here to download the Specifications.
Drawings:
Please click here to download the drawings.
Please click here to download the informational drawings. |
Legal Notice: Please click here to download the legal notice. |
| Bid Name |
Date Issued |
Bid Opening |
Download |
Bid: DeWitt Spain Hangars Siding Replacement
Project # 11-1334-07
|
05/13/2013 |
06/20/2013
2:00 pm
Local Time |
See below |
Mandatory Meeting: A MANDATORY Pre-Bid Meeting will be held Tuesday, June 4, 2013, at 9:00 AM at the General DeWitt Spain Airport, 2787 North Second Street, Memphis, Tennessee 38127.
Only Prime Contractors who attend the Pre-Bid Meeting will be permitted to submit a bid. The project site will be available for inspection immediately following the meeting. |
Bid Documents: Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings. |
Legal Notice: Please click here to download the legal notice. |
SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S SMALL BUSINESS PROGRAM
Future Projects
| De-Ice Pad(s) |
|
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in planning. Estimate Date of Design: T.B.D. Estimated Date of Construction: T.B.D. . Click here for sketch.
|
| De-Ice Glycol Controls |
|
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.
|
| Plough Cargo Ramp |
|
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.
|
| CB Switchboard Replacement |
|
Project includes full replacement of the CB switchboard for two motor control centers. Project is currently in design. Estimated Date of Construction: 2013. |
| Motor Control Center Replacement |
|
Project includes full replacement of several motor control centers. Project is currently in design. Estimated Date of Construction: 2013. |
| Substation Replacement |
|
Project includes full replacement of two substations. Project is currently in design. Estimated Date of Construction: 2013. |
| Charles W. Baker Airport – Airfield Improvements |
|
Project includes taxiway relocation and airfield lighting systems replacement. Project is currently in design. Estimated Date of Construction: 2014. Click here for sketch.
|
| General DeWitt Spain Airport – Airfield Improvements |
|
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.
|
| Terminal Building Seismic Retrofit |
|
Project includes retrofit to improve the airport’s seismic resilience. Project is currently in planning. Estimated Date of Design: 2014. Estimated Date of Construction: T.B.D.. |
| Hurricane Creek Taxiway Crossing |
|
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.
|