Construction Bids/SOQs

Please click here to view the MSCAA Master Plan.

SOQs



Construction

Bid Name Date Issued Bid Opening Download
Bid: Demolition of former City of Memphis Humane Shelter
Project # 13-1361-00
05/08/2013 05/28/2013 2:00 pm
Local Time
See below
Mandatory Meeting:
A Mandatory Pre-Bid Meeting was held on Friday, May 17, 2013, at 9:00 AM at the Project Center, 4225 Airways Boulevard, Memphis, Tennessee 38116. The project site was available for inspection immediately following the meeting.

Sign-In Sheets:
Please click here to download the Sign-In Sheets.

Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda distributed at the Mandatory Pre-Bid Meeting.
Proposal Package:
Please click here to download Proposal Package.

Specifications:
Please click here to download the Specifications.

Drawings:
Please click here to download the drawing.
Legal Notice:
Please click here to download the legal notice.

Bid Name Date Issued Bid Opening Download
BID: Demolition of Regency Inn & Suites
Project # 12-1348-00
05/08/2013 05/29/2013
2:00 pm
Local Time
See below
Addendum 1:
Please click here to download Addendum 1.

Exhibit C:
Please click here to download Exhibit C as referenced in Addendum 1.
Mandatory Meeting:
A Mandatory Pre-Bid Meeting was held on Wednesday, May 15, 2013, at 9:00 AM at the Project Center, 4225 Airways Boulevard, Memphis, Tennessee 38116. The project site was available for inspection immediately following the meeting.

Sign-In Sheets:
Please click here to download the Sign-In Sheets.

Pre-Bid Agenda:
Please click here to download the Pre-Bid Agenda distributed at the Mandatory Pre-Bid Meeting.
Proposal Package:
Please click here to download Proposal Package.

Specifications:
Please click here to download the Specifications.

Drawings:
Please click here to download the drawings.
Please click here to download the informational drawings.
Legal Notice:
Please click here to download the legal notice.

Bid Name Date Issued Bid Opening Download
Bid: DeWitt Spain Hangars Siding Replacement
Project # 11-1334-07
05/13/2013 06/20/2013
2:00 pm
Local Time
See below
Mandatory Meeting:
A MANDATORY Pre-Bid Meeting will be held Tuesday, June 4, 2013, at 9:00 AM at the General DeWitt Spain Airport, 2787 North Second Street, Memphis, Tennessee 38127.

Only Prime Contractors who attend the Pre-Bid Meeting will be permitted to submit a bid. The project site will be available for inspection immediately following the meeting.
Bid Documents:
Please click here to download the Proposal Package.
Please click here to download the Specifications.
Please click here to download the Drawings.
Legal Notice:
Please click here to download the legal notice.


SMALL BUSINESS PROGRAM (“SBP”) PROJECTS
PLEASE CLICK HERE FOR INFORMATION ON MSCAA’S SMALL BUSINESS PROGRAM


Future Projects

De-Ice Pad(s)
Project includes design and construction of deice pad(s) for winter operations. May include a cross-field southern connector for improved taxi operations and a bridge or tunnel structure for Louis Carruthers Drive, if required. Project is currently in planning. Estimate Date of Design: T.B.D. Estimated Date of Construction: T.B.D. . Click here for sketch.

De-Ice Glycol Controls
Project includes facilities to collect, convey, and either treat or export glycol-based pollutant from deicing fluids. Project is currently in planning. Estimated Date of Design: T.B.D. Estimated Date of Construction: T.B.D. Click here for sketch.

Plough Cargo Ramp
Project includes design and construction of a new cargo ramp. Includes, but is not limited to, the following disciplines: civil, electrical, and fueling. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

CB Switchboard Replacement
Project includes full replacement of the CB switchboard for two motor control centers. Project is currently in design. Estimated Date of Construction: 2013.

Motor Control Center Replacement
Project includes full replacement of several motor control centers. Project is currently in design. Estimated Date of Construction: 2013.

Substation Replacement
Project includes full replacement of two substations. Project is currently in design. Estimated Date of Construction: 2013.

Charles W. Baker Airport – Airfield Improvements
Project includes taxiway relocation and airfield lighting systems replacement. Project is currently in design. Estimated Date of Construction: 2014. Click here for sketch.

General DeWitt Spain Airport – Airfield Improvements
Project includes runway extension, taxiway relocation, airfield lighting systems replacement, and levee relocation. Project is currently in design. Estimated Date of Construction: T.B.D. Click here for sketch.

Terminal Building Seismic Retrofit
Project includes retrofit to improve the airport’s seismic resilience. Project is currently in planning. Estimated Date of Design: 2014. Estimated Date of Construction: T.B.D..

Hurricane Creek Taxiway Crossing
Project includes a reinforced concrete box culvert across Hurricane Creek designed to support aircraft loading for a taxiway crossing of the creek. Project design is complete. Estimated Date of Construction: T.B.D. Click here for sketch.